March 31, 2008

Remodeling Project


March was a busy month.

We started a kitchen remodeling project that grew and grew. It didn't start out as a remodeling project. We had to replace the flooring. Being that we were going to replace the flooring, it was a good time to repaint the cupboards in case we dripped paint. Being that we were repainting the cupboards, it was a good time to fill the holes and replace the door knobs. While we were at it, we removed the microwave from the awkward location it was in and bought a new one that goes over the stove. Cabinet maker, Craig Roe, made us a new cupboard where the microwave was. He also adjusted the cupboard above the stove and after we removed the old dishwasher, Craig made a cupboard for the wastebasket. Being that Craig was doing all that stuff..... it was a good idea for him to also replace the counter tops. We stopped before we replaced the kitchen sink.